Thanks To : Soil Test Amazon Most Gifted Gps Navigator Structural Engineer
วันศุกร์ที่ 29 เมษายน พ.ศ. 2554
Real Estate Projects - Quality of Construction
We often come across the woes of a home buyer in the consumer complaints column of the newspaper. For instance when the construction was started the building had a different plan and later the size of the floor plans for living space and even bedrooms were changed. There is no cross ventilation in the rooms which makes them unhygienic and unfit to reside in. The paint finishing is also floor and so is the wood polish. Within a few months of possession there is seepage problem in the kitchen and with the monsoons creating havoc in the city, life is unbearable. No sunshades were provided as promised and the tiles are placed in a poor fashion. The rates for modular switches he provided were double the market price of a quality brand. Even the sanitary fittings were not Parry ware.
สมัครสมาชิก:
ส่งความคิดเห็น (Atom)
ไม่มีความคิดเห็น:
แสดงความคิดเห็น